Sunday, January 25, 2009

Sheetrock, tape, mud and some tile

We are nearing the end. We are now fully Sheetrock, taped and muded (what ever you would like to call that). Currently, we have the tile guy in to tile all the bathrooms and the kitchen floor. That should be done on Friday this week (including all grouting). Today we went to the house to rip up the old dining room table that was 55 years old to get a new one in since there were too many odd patches to make and it would not have looked correct if we did it that way.


Here are some pictures of the house now:

Kitchen- You can see in the first picture the flooring going in and in the second picture a close up of the floor.




Dining Room- opens from the kitchen. Scott is riping up the old floor that is 55 years old.

R>
Office- the floors are staying as is in here except they will get sanded, restained and polyied.





Upstairs hallway looking downstairs- these stairs will get stained and then we will put in a runner going down them.




Master Bedroom- Trim and doors are going in now in all bedrooms and bathrooms.



Master bathroom- We are waiting for tile to go in this week. The following week the walls will get painted and then the vanities and toilet will go in.



2nd Bedroom & 3rd Bedroom- doors and trim are going in and we are waiting for painting to get started and then carpet installed.




2nd Bathroom- tiling has started and will be done at the end of the week!



That is all for now. More pictures of the house to come next weekend once tile and grout are done and we can walk on the floors.













No comments: